
Optimizing sawmill production with technology and Pro X – MGPaletes Group
40% → 65%sawmill availability
With
- Wood
Pro X
Sawmill availability from 40% to 65%
Machine stops, production times, raw material quality, performance, availability. These are the essential factors you need to track on your line every day. But by hand? Impossible. That is why
See below the testimonial from our customer, Industrial Director Roberto Sestrem, on how the system helped open their eyes and further optimize the sawmill.
How Pro X works in the sawmill
With this data, the dashboard shows production against the target and OEE (availability × performance × quality) on the computer, on the factory TV and on the phone. Availability, one of the three OEE factors, is what rose from 40% to 65% at MGPaletes Group.
- Customer
- MG Paletes (opens in a new tab)
- Industry
- Wood
- Product
Pro X - Published
What changed
Before
Machine stops, production times, raw material quality, performance and availability tracked by hand: impossible day to day.
After
- The sawmill now knows what really happens on the line.
- Availability from 40% to 65% since installation.
In the customer’s words
“Without
Pro X, today we would not know what really happens in our sawmill. Since its installation, we have raised sawmill availability from 40% to 65%.”
Testimonial originally in Portuguese.
Get to know Pro X
-
Production control
Real-time production control: laser sensors count and measure every piece on the line, log stops with their reason and show production and OEE on the computer, on the factory TV and on your phone.
Other case studies
Talk to the people who installed this system
Tell us about your process and what you want to improve. A specialist replies with the solution and a quote for




